Apparel, lifestyle goods, stationery and keyring productionMinimum order quantity varies by itemProduction schedules are confirmed during consultation
/
Free quote

Production Guide · Quantity & timing

How long does production take?

Production takes 1 to 5 weeks depending on the item, counted from payment and final approval of the mockup and specs.

Written by the O-SEAN consulting team · Reviewed by Danny (CSO, 22 years in merchandising, SCM and QC) · Last reviewed

CategoryLead time
Apparel2 to 4 weeks (uniform jersey 4 weeks)
Fashion accessories2 to 4 weeks
Bags & pouches2 to 5 weeks
Tumblers & cups2 to 4 weeks
Digital merch2 weeks
Seasonal merch1 to 2 weeks
Keyrings & acrylic1 to 4 weeks
Stationery1 to 2 weeks
Living2 weeks
Print & packaging1 to 4 weeks

The lead times in the table are in business days, and 1 week counts as 5 business days, excluding weekends and public holidays.

Production time for every product, by category

Apparel & Team Wear47 items

ProductProduction time
Light Hoodie2 weeks
Basic Hoodie2 weeks
Basic Windbreaker2 weeks
Light Sweatshirt2 weeks
Light Zip-Up Hoodie2 weeks
Hooded Windbreaker2 weeks
Basic Sweatshirt2 weeks
Light Crewneck Short Sleeve T-Shirt2 weeks
Basic French Terry Hoodie2 weeks
Heavyweight French Terry Hoodie2 weeks
Oversized Light Hoodie2 weeks
Oversized French Terry Hoodie2 weeks
Vintage Pigment-Washed Hoodie2 weeks
Basic Zip-Up Hoodie2 weeks
Basic French Terry Zip-Up Hoodie2 weeks
Heavyweight French Terry Zip-Up Hoodie2 weeks
Oversized Light Zip-Up Hoodie2 weeks
Oversized French Terry Two-Way Zip Hoodie2 weeks
Vintage Pigment-Washed Two-Way Zip Hoodie2 weeks
Stadium Jacket2 weeks
Basic Fleece Jacket2 weeks
Boucle Fleece Jacket2 weeks
Fleece Hooded Anorak2 weeks
Cotton Coach Jacket2 weeks
Nylon Coach Jacket2 weeks
Pocket Work Vest2 weeks
Basic Fleece Vest2 weeks
Boa Fleece Vest2 weeks
Basic French Terry Sweatshirt2 weeks
Heavyweight French Terry Sweatshirt2 weeks
Oversized Light Sweatshirt2 weeks
Oversized French Terry Sweatshirt2 weeks
Vintage Pigment-Washed Sweatshirt2 weeks
Light Crewneck Long Sleeve T-Shirt2 weeks
Basic Crewneck Long Sleeve T-Shirt2 weeks
Heavy Crewneck Long Sleeve T-Shirt2 weeks
Oversized Crewneck Long Sleeve T-Shirt2 weeks
Basic Pique Polo Shirt2 weeks
Side-Slit Pique Polo Shirt2 weeks
Quick-Dry Performance Crewneck T-Shirt2 weeks
Basic Crewneck Short Sleeve T-Shirt2 weeks
Pocket Crewneck Short Sleeve T-Shirt2 weeks
Heavyweight Crewneck Short Sleeve T-Shirt2 weeks
Oversized Crewneck Short Sleeve T-Shirt2 weeks
Vintage Pigment-Washed Crewneck T-Shirt2 weeks
Semi-Oversized Drawstring Hem T-Shirt2 weeks
Team Uniform Jersey4 weeks

Fashion & Accessories5 items

ProductProduction time
Bucket Hat4 weeks
Baseball Cap2-3 weeks
Custom Socks4 weeks
Indoor Slippers2-3 weeks
Custom WristbandOn request

Values in these tables come straight from our product data and update when it changes. Items marked On request are confirmed at the quote stage.

Simple merch that does not combine several items takes about 10 business days as standard, and kits or packages that combine several items take about 14 business days.

Delays in sending files or approving mockups push the production schedule back by the same number of days (Terms, Article 8). If the schedule is tight, O-SEAN first checks whether items with a finalized design and a simple process can be made faster than the standard lead time.

Items with acrylic molding or special finishing are hard to rush and carry an extra charge.

Frequently asked questions

How long does merch production usually take?

The standard merch production time is about 10 business days for simple merch and about 14 business days for kits and packages, and lead time by item ranges from 1 week to 5 weeks. The minimum order and lead time for key items are in the table.

Delivery time is separate, so confirm the receiving date at the quote stage.

When does the lead time start?

The lead time starts when payment is complete and the final mockup and product specs are confirmed, and it is counted in business days. One week in the table counts as 5 business days, as set out in Terms, Article 8.

Delays in sending files, approving mockups or making decisions can push production and delivery back by the same number of days. If your event date is fixed, it is best to plan the mockup review schedule first.

Does production take longer in peak seasons such as year-end or summer?

In peak seasons, schedules can change because of material supply or shipping conditions, so ordering earlier than usual is recommended. If material supply or shipping conditions affect the delivery schedule, O-SEAN informs you in advance and agrees on the schedule with you.

For summer events, handheld fans have a standard lead time of 1 to 2 weeks, and umbrellas, beach towels and neck coolers 2 weeks, so get a quote before the season starts.

Will you tell me in advance if shipping will be later than the scheduled date?

Yes, if shipping will be later than the scheduled date, O-SEAN tells you the reason without delay and agrees on a new delivery schedule. O-SEAN also explains the reason and the revised schedule when a cause beyond control occurs, such as natural disasters, shipping delays or material supply problems.

You can check progress with your consultant at any time.

Tell us what kind of merch
you need, however you like

A dedicated consultant supports you all the way through. We reply to quote requests within 4 hours on average.