Tremolo promo cooling sleeves: 10,000 units delivered exactly on an 8-week schedule
An event merch case that held a 10,000-unit run to the promised date while designing cooling & UV-protection functional fabric and packaging together.
Client
Tremolo
Industry / Solution
Manufacturing / Campaign & Promotion
Timeline
Within 8 weeks · 2026.02
Scale
1 item · 10,000 units
How to get 10,000 cooling & UV-protection sleeves within 8 weeks
For its promotion, Tremolo prepared one merch item: 10,000 cooling arm sleeves. Once volume reaches the 10,000-unit scale, the biggest variable is keeping the promised date. On top of that, cooling sleeves are not simple printed goods — they carry real-use performance requirements like cooling and UV protection, so fabric selection would decide how satisfying the result felt.
O-SEAN applied a fabric with cooling and UV-protection properties to the product itself, and designed the packaging separately from the material up, carrying the functional concept all the way through. The entire 10,000-unit run was produced within an 8-week schedule starting February 2026.
In the end, all 10,000 units were delivered exactly on the promised date. Following this campaign, Tremolo decided to continue with O-SEAN for its winter giveaway production as well.
Even at 10,000 units, everything was produced exactly on the promised date without a hitch. The packaging was designed separately around the cooling and UV-protection functionality, down to the material, so ordering was easy. We're planning to prepare our winter giveaways with O-SEAN too.