Tremolo promo cooling sleeves: 10,000 units delivered exactly on an 8-week schedule
Client
Tremolo
Industry / Solution
Manufacturing / Campaign & Promotion
Timeline
Within 8 weeks · 2026.02
Scale
1 item · 10,000 units
How to get 10,000 cooling & UV-protection sleeves within 8 weeks
For its promotion, Tremolo prepared one merch item: 10,000 cooling arm sleeves. Once volume reaches the 10,000-unit scale, the biggest variable is keeping the promised date. On top of that, cooling sleeves are not simple printed goods — they carry real-use performance requirements like cooling and UV protection, so fabric selection would decide how satisfying the result felt.
O-SEAN applied a fabric with cooling and UV-protection properties to the product itself, and designed the packaging separately from the material up, carrying the functional concept all the way through. The entire 10,000-unit run was produced within an 8-week schedule starting February 2026.
In the end, all 10,000 units were delivered exactly on the promised date. Following this campaign, Tremolo decided to continue with O-SEAN for its winter giveaway production as well.
Even at 10,000 units, everything was produced exactly on the promised date without a hitch. The packaging was designed separately around the cooling and UV-protection functionality, down to the material, so ordering was easy. We're planning to prepare our winter giveaways with O-SEAN too.
Tremolo
Associate
Ten thousand units or technical fabrics, delivered exactly on the promised date.
Made in this case
Merch produced in this case
Similar merch?
Let's build it together
Just point to a case you like. We'll make it from planning to production.